The City of Lakewood says it plainly in its own draft 2026 Parks Legacy Plan. Lakewood incorporated in 1996, "after most of the lakes were surrounded by private residences," and providing public water access "remains a challenge even though Lakewood has a large amount of waterfront property." That history decides where the next public footholds on the water can go. Most of the new access coming in the next two years will be built on small pieces of land the city already controls: street ends that run down to the shoreline, an undeveloped park with a primitive ramp, and a boat launch owned by the state. Each one moves on a different schedule, and each comes with its own limits.

What the City Itself Counts as Public Access

The Legacy Plan's lake table is the clearest baseline available, because it counts formal public access rather than every patch of public land that happens to touch the water.

Lake Area Public access, per the draft Legacy Plan Boating
American Lake 1,091.3 acres Two city parks and boat launches Yes
Lake Steilacoom 306 acres Public boat launch Yes
Gravelly Lake 160 acres No public access point Yes
Wards Lake 66.8 acres Waterfront Non-motorized
Lake Louise 38.2 acres No formal public access point Limited motorized
Waughop Lake 33 acres Waterfront Non-motorized
Carp Lake 13 acres No public access point Non-motorized

Gravelly Lake covers 160 acres and allows boating, yet the plan lists no public access point there at all. Lake Steilacoom is nearly twice as large and has a single public launch. Across the city's seven named lakes, American Lake is the only one with more than one formal public entry point, and one of its launches sits at American Lake Park.

Thirteen Dead Ends That Touch the Water

The raw material for change is already on the map. The city counts 13 lakefront street ends, which are pieces of public right-of-way or easements that "dead end" into public lakes. The City's street ends page notes that these sites "are not considered parks or parkland." Seven are on Lake Steilacoom: Westlake Ave., Mt Tacoma Dr., Beach Lane, Lake Ave., 100th St, Holly Hedge and Edgewater Park. American Lake has two, at Lake City Blvd. and Wadsworth St. So does Lake Louise, at 104th St/Melody Lane, which the city labels a boat launch, and Holden St. Gravelly Lake has two as well, at Hill Top Lane and Linwood Lane.

These lists explain why the lake table and the map don't match. Lake Louise has a street end the city calls a boat launch, but the Legacy Plan still lists the lake as having no formal public access point. Gravelly Lake has two public street ends and is listed with no access point at all. A right-of-way that reaches the water is not the same as a place built for people to use it.

In 2023 the city updated its 2009 street end report. The new report reviewed all 13 sites, drafted plans and cost estimates, and built a priority matrix to decide which ones to develop first. The 2024 update to that matrix scored each site on access, use, development potential, equity and environmental impacts:

Street end Lake Score
Westlake Ave Steilacoom 17
Lake City Blvd American 17
Wadsworth St American 16
Linwood Ln Gravelly 15
Hilltop Ln Gravelly 14
100th St Steilacoom 12
Beach Lane Steilacoom 11
104th St/Melody Ln Louise 10
Holden St Louise 10
Mount Tacoma Dr Steilacoom 9
Lake Ave Steilacoom 8
Holly Hedge Ln Steilacoom 3

Both Gravelly Lake sites score higher than every Lake Steilacoom street end except Westlake. After Westlake, the plan names Lake City Blvd and Wadsworth St on American Lake and Linwood Ln on Gravelly Lake as the next potential projects. If that order holds, the lake the city lists with no public access point will get its first one.

Westlake Avenue Goes First

Westlake Avenue, on Lake Steilacoom, tied Lake City Blvd for the top score. On the recommendation of the Parks and Recreation Advisory Board, the City Council chose it as the pilot. The design adds parking, an accessible trail to the beach, habitat and stormwater improvements, signs, site furnishings and fencing. The project budget is $740,000, and the city expects construction in Q4 2026 through Q1 2027.

The contract has been working through approvals this fall. The City's September 18 weekly bulletin listed an agreement with RW Lockwood Construction for $364,735.84 for the Westlake Ave SW Street End Pilot Project. The advisory board's September director's report lists the permits as in their final stage and the bid award as 9/21/2026. As of the City's October 9 bulletin, the project was still described as "in the contracting phase." With the construction window opening this quarter, Westlake is the only new public lake access in Lakewood that could break ground in 2026.

This pilot matters beyond one street. The city calls Westlake "the City's first street end development," and it is the test case for the other twelve. The questions it answers about parking, fencing and how a small site holds up next to its neighbors will shape what gets proposed at Lake City Blvd, Wadsworth St and Linwood Ln.

Edgewater Park: Same Lake, Ten Times the Budget

The other Lake Steilacoom project is much larger, and it moves much more slowly. Edgewater Park appears on the city's street end inventory, and the City describes it as the lake's only public boat launch. Today the site is undeveloped, with a primitive, steep launch and little or no parking next to it.

The current plan includes right-of-way and stormwater work, parking, a swim area, a fishing pier, a relocated boat launch, a restroom and shelter, shoreline habitat restoration, site furnishings and accessible paths. The budget is $7.5 million, about ten times Westlake's. The City says it received multiple grants and a legislative allocation in 2024 to carry out the master plan approved in 2023.

The schedule is long because the site needed rezoning first. The advisory board reports that the shoreline redesignation was completed with the comprehensive plan update. The October 9 bulletin puts permitting from fall 2026 into the third quarter of 2027 and points to the rezoning, the complexity of shoreline development and extensive local and state agency review. The two City sources disagree on when building starts. The capital projects page lists construction for 2027 to 2028, and the September advisory board report says 2028. Until then, the steep ramp is still the only public boat launch on Lake Steilacoom.

Camp Murray: The Launch the City Doesn't Own

On American Lake, the open question is about management more than construction. The Camp Murray Boat Launch sits on the lake's southern shore, between the Tillicum neighborhood to the east and Camp Murray to the west. The State of Washington owns it and leases it to the Washington Department of Fish & Wildlife, which runs it. Use of the site requires a Discover Pass or a daily pass. The City's project page says it serves boating and fishing and that swimming is not allowed. The Lakewood Police Department and West Pierce Fire & Rescue also use it to reach the lake.

The City, the Washington Military Department, the 194th Air Guard and WDFW are discussing how the site could be renovated and run. The project's online open house lists what the launch lacks today: paved parking, good drainage, accessibility, pedestrian and bicycle facilities, an ADA-compliant restroom, a boarding float and defined circulation. It also describes the site as offering year-round access for swimmers, which doesn't match the City page's no-swimming rule.

The preliminary designs offer two directions:

  • Design A keeps the current arrangement, with the state as owner and WDFW as operator. It focuses on boating and fishing and discourages swimming and picnicking.
  • Design B adds more amenities and uses. The City says this would go beyond what WDFW can maintain and secure, so it would need more funding and maintenance from the City.

The concept drawings show upgrades such as paved parking with marked boat-trailer and ADA spaces, drainage and biofiltration, a restroom, a boat-wash station, a concrete ramp and an ADA floating dock. The second concept adds a fish-cleaning station, a kiosk, a shelter and beach trails. The City describes the master plan as in its final stages and slated for City Council in November 2026. These are planning concepts, not construction designs. Any improvements still depend on funding and on who agrees to run the site.

The Dates Between Now and 2028

The plan that ties all of this together comes up for a decision soon. Public comment on the Parks Legacy Plan closed September 30. A Council study session is scheduled for October 19, and final adoption is slated for November 2, 2026. The draft names better access to special-use facilities, water access among them, as a gap in the park system. It also proposes improvements to public water access as a 2027 to 2032 project. Questions about the street ends program go to Ted Thelin, the City's Parks Planner.

Coming up:

  1. October 19: Council study session on the final Legacy Plan.
  2. November 2: Legacy Plan adoption slated.
  3. November: Camp Murray Boat Launch Master Plan before Council.
  4. Q4 2026 to Q1 2027: Westlake Avenue street end construction window.
  5. Fall 2026 to 3Q 2027: Edgewater Park permitting, with construction listed for 2027 to 2028.

If you own a home on American Lake, Lake Steilacoom or Gravelly Lake, a new public access point down the street changes what your waterfront is worth to the next buyer. At Lori DeVore & Co., we track Lakewood's lake access projects so we can price shoreline homes against the current public access map. Request a complimentary home valuation and we'll show you how these projects bear on your property.